High School Phase 2

Phase 2 of Godley High School included a four-story Career and Technology Center (CTE) and core classroom addition integrated into the home side of the football stadium and a competition arena and locker room addition on the visitor side of the stadium. These additions increased the campus capacity to approximately 1,160 students. The CTE addition, also known as The Wildcat Innovative Learning Destination (WILD) houses a variety of programs such as IT/Networking, Marketing, Ag, Engineering, Health Science, and AV and allows the district to increase the number of certifications that can be achieved within those curricula. The stadium and arena do not sit idle outside of game days. Each floor of the CTE addition is integrated into the stadium to provide a variety of outdoor classrooms that are used every day. The arena includes a multi-purpose presentation space that seats 300 people and can be separated from the gym for day-to-day use. The football stadium capacity seats approximately 3,800 spectators on the home side and 1,800 on the visitor side. The future master plan build-out will make the visitor seating equal the home side capacity. As part of Phase 2, there are also new tennis courts located near the Agricultural Center, new synthetic turf on the baseball, softball, and football fields, and a new track.

Due to unprecedented material cost increases as a result of the Covid-19 pandemic, the earlier design that included a three-story classroom addition behind the visitor side stadium was re-evaluated, and more efficiency was gained by moving the core classroom and science lab spaces to the CTE addition. This also provides the district with greater flexibility of what the visitor side stadium addition can be in a later phase.

High School Phase 2 Construction