High School Phase 3

Phase 3 of Godley High School included an expansion to the kitchen and to the Center for Learning and Innovation. The kitchen expansion provides the necessary capacity to serve the full master-planned campus population of 2,500 students, while the CL&I expansion makes room for growth up to 2,000 students with another addition planned. The addition also includes fine arts spaces for band, choir, and visual arts that increases the overall campus capacity to approximately 1,300 students. The band suite serves as the campus’ tornado shelter. The front of the addition was built with the future in mind by using materials and creating openings that can be easily modified when a multi-story classroom addition, performing arts center, and other fine arts spaces will be added in the future.

High School Phase 3 Construction